Sited in the scenic upper River Tame valley Barret Homes residential development required a new 23 metre span access bridge and the re-decking of an existing Victorian access bridge over the River Tame.

Bridges at the Waters Edge, Mossley

CLIENT
Westshield

DEVELOPER
Barratt Homes

ADOPTING AUTHORITY
Tameside Metropolitan Council

Project Description

Our experienced bridge design structural engineers designed the new bridge in accordance with the Design Manual for Roads and Bridges (DMRB). For ease and speed of construction the bridge deck was designed with standard pre-stressed pre-cast concrete Y- section Bridge beams, supported on piled abutments incorporating a shielded integral bridge deck construction. Tameside BC required the bridge to be sympathetic with the heritage and environment of the area, therefore, Victorian style cast aluminium vehicular collision parapets were incorporated in the design. Stone facing is used on the sub-structure to reflect the local building heritage.

The original masonry sub-structure of the existing Victorian access bridge was assessed and appropriately strengthened. The existing cast iron deck failed to pass the bridge assessment and was replaced with a new deck consisting of pre-stressed pre-cast reinforced concrete T beams.

Thomas Consulting also designed a reinforced masonry high impact vehicular high containment barrier (required to satisfy planning conditions) to protect against vehicles leaving the estate road and falling into the deep river channel.

A message from Thomas Consulting
Here at Thomas Consulting as other organisations during this time of uncertainty with COVID-19 we are responding to the Government recommendations to try and reduce the spread of the virus. Staff have been made aware of the steps that need to be taken if they show any signs of the infection or have been in contact with others with the symptoms and are updated with any changes daily. That said we are focused on delivering safe, reliable on-going support to both new and existing clients; having implemented measures to ensure that we are able to have staff working remotely (i.e. at home) reducing their contact both with each other and clients to keep all as safe as is possible.

Unfortunately site meetings are postponed until the current restrictions are reviewed and updated and each meeting/site visit will be assessed individually at that time. All other elements of each project will continue to be progressed where possible and each member of the team will be updating clients on their progress.

Thomas Consulting are committed to continue to review the Governments recommendations and make the necessary changes that enable our projects to be delivered on time collaboratively during this period with the minimum amount of risk.

Unfortunately this is going to be an ongoing process for the next few months with constant review; however should you need to contact any member of our team the following numbers will always be available during our normal working hours of 9am - 5pm Monday - Friday 01743 237940 (Shrewsbury), 01772 299040 (Chorley) and 01524 846022 (Lancaster).