Case Study

Manchester Airport terminal 2 reconfiguration

The Manchester Airport Terminal 2 Reconfiguration project was recognised as Project of the Year at the Structural Steel Design Awards 2026, highlighting the achievement of everyone involved in delivering this complex scheme.

Thomas Consulting provided structural engineering design input and fabrication support for the project, contributing to the extensive structural modifications required within a live, operational airport. More than 1,000 tonnes of structural steelwork was wheeled into the building without the use of a crane, presenting significant engineering and logistical challenges.

OUR ROLE

Thomas Consulting provided design input for complex structural modifications, including bespoke steelwork connections, strengthening of existing structures and temporary works design.

Working closely with our client, McCrory Holdings, and the steelwork fabricators, our team helped develop structural solutions to support the installation process, limit disruption to airport operations and maintain separation between landside and airside boundaries.

Challenges

Delivering extensive structural modifications within a live, operational airport required careful planning and coordination to minimise disruption while maintaining safe separation between landside and airside operations.

The installation of more than 1,000 tonnes of structural steelwork fabricators, alongside bespoke connection design, structural strengthening and temporary works solutions to accommodate the constraints of the existing building and operational environment.

SUCCESSES

Thomas Consulting worked collaboratively with McCrory Holdings and the steelwork fabricators to develop bespoke engineering solutions tailored to the project’s complex requirements.

Through detailed design input, structural strengthening, bespoke steelwork connections and temporary works design, our team helped facilitate the installation of more than 1,000 tonnes of structural steelwork, wheeled into the building without a crane lift.

The coordinated approach helped limit disruption and maintain the necessary separation between landside and airside boundaries throughout the works.

Thomas Consulting is proud to have contributed to this landmark project and its recognition as Project of the Year at the Structural Steel Design Awards 2026

MORE CASE STUDIES